Concreting Specifications
Concrete Hardstanding
- Excavate to reduced depth of 100mm below finished level (250mm below dpc) and cart all soil to licensed, off-site tip.
- Supply and erect all necessary formwork and shuttering.
- Supply and place 1 layer of PIFA 1200 Damp Proof Membrane to base. Lap joints to be taped with min. 350mm overlap.
- Supply, place and finish 100mm of Class C30 mass concrete in bays as required.
- Include expansion joints as required, comprising full depth flexible filler board with 30mm suitable sealant to top of joint.
- Surface to be brush and trowel finish.
- Clear all site of shuttering, debris and rubble on completion and make good.
Pattern Imprinted Concrete
- Excavate to reduced depth of 100mm below finished level (250mm below dpc) and cart all soil to licensed, off-site tip.
- Supply and erect all necessary formwork and shuttering.
- Supply, place and finish 100mm of Class C30 fibre-reinforced mass concrete in bays as required.
- Surface of concrete to be imprinted with texture mats.
- Border to be imprinted with INSERT PATTERN texture and body to be imprinted with INSERT PATTERN texture.
- All mats to be fully square and correctly aligned with no deviation from line.
- Supply and apply 2 coats of acrylic sealant.
- Clear all site of shuttering, debris and rubble on completion and make good.
- Cut crack control joints as required.
Gravel Hardstanding
- Excavate to reduced depth of 150mm below finished level (300mm below dpc) and cart all soil to licensed off-site tip.
- Excavate any soft spots in sub-grade as required and dispose.
- Supply, lay and compact minimum of 100mm of DTp1 crushed stone sub-base material to falls and levels.
- Supply, lay and compact 40mm of INSERT SIZE mm decorative gravel INSERT NAME HERE
- Clear all site of debris and rubble on completion and make good.
Make your home complete with
"Complete Driveways"
"Complete Driveways"